Transcription

E.PLUMBING GENERAL NOTES1.ALL PLUMBING WORKS INCLUDED HEREIN SHALL BE EXECUTED ACCORDING TOTHE PROVISION OF THE NATIONAL PLUMBING CODE OF THE PHILIPPINES ANDTHE LOCAL RULES AND REGULATIONA.1.VERTICAL PIPINGPLASTIC PIPE - SHALL BE SUPPORTED AT EVERY - (1) METER INTERVALB.1.HORIZONTAL PIPINGPLASTIC PIPE - SHALL BE SUPPORTED BY STIFF METAL BACKINGHANGERS IN ITS ENTIRE LENGTH FOR SMALL SIZE TUBING UP TO 38mmDIAMETER AND WITHOUT BACKINGS BUT WITH SPACED METAL HANGERSAT APPROVED FOR LARGER-SIZE TUBING.C.1.PLUMBING FIXTURESPLUMBING FIXTURE SHALL BE MANUFACTURED OF DENSE, DURABLE,NON-BORBENT MATERIALS AND HAVE SMOOTH, IMPERVIOUS SURFACES,FREE FROM UNNECESSARY CONCEALED FOULING SURFACES, EXCEPT ASPERMITTED ELSEWHERE IN THIS CODE, ALL FIXTURE SHALL CONFORM INQUALITY AND NATIONAL RECOGNIZED APPLICABLE STANDARDS.1.D.1.2.EACH PLUMBING FIXTURE SHALL BE APPROVED WITH AN ADEQUATESUPPLY OF POTABLE RUNNING WATER, SO ARRANGED AS TO FLUSH ANDKEEP SAME IN CLEAN AND HEALTHFUL CONDITIONS WITHOUT DANGER OFBACKFLOW OR CROSS-CONNECTION.SEWERLINEDRAINAGE PIPING SHALL BE PROVIDED WITH APPROVED INLET FITTINGSFOR FIXTURE CONNECTIONS, CORRECTLY LOCATED ACCORDING TO THESIZE AND TYPE OF FIXTURE PROPOSED TO BE CONNECTED.CHANGE IN DIRECTION OF DRAINAGE PIPING SHALL BE MADE BY THEAPPROPRIATE USE OF APPROVED FITTINGS AND SHALL BE OF THEANGLES PRESENTED BY A 22 21 DEGREES OR 181 BEND, 45 DEGREES OR 81BEND AND 60 DEGREES OR 61 BEND OR OTHER APPROVED FITTINGS.PBAGUIO GENERAL HOSPITALAND MEDICAL CENTERBAGUIO CITYCORDILLERA ADMINISTRATIVE REGIONNO EVAPORATIVE COOLER, OR SIMILAR AIR CONDITIONING EQUIPMENT SHALL HAVE ANYDRAIN PIPE IN CONNECTION THEREWITH, DIRECTLY CONNECTED TO ANY SOIL, WASTE ANDVENT PIPE SUCH EQUIPMENT SHALL BE DRAINED BY MEANS OF INDIRECT WASTE PIPESAND ALL WASTES DRAINED BY THEM SHALL DISCHARGE THROUGH AN AIRBREAK INTO ANOPEN FLOOR SINK OR OTHER APPROVED TYPE RECEPTOR PROPERLY CONNECTED TO THEDRAINAGE SYSTEM.coVENT PIPES1.2.G.PUEACH PLUMBING FIXTURE TRAP, EXCEPT AS OTHERWISE PROVIDED IN THIS CODE, SHALLBE PROTECTED AGAINST SIPHONAGE AND BACK-PRESSURE, AIR CIRCULATION SHALL BEASSURED THROUGHOUT ALL PARTS OF THE EXCRETA DRAINAGE SYSTEM BY MEANS OFVENT PIPES.PD1SANITARY ENGINEERALL VENT PIPES SHALL EXTEND UNDIMINISHED IN SIZE ABOVE THE ROOF SHALL BERECONNECTED WITH THE SOIL OR WASTE STACK VENT OF PROPER SIZE AT A POINTBELOW THE ROOF, THE VENT THROUGH THE ROOF (VSTR) SHALL INCREASE ONE (1) PIPESIZE ABOVE.LENON S. BANA-E, CE, SEDrawings and specifications andother contract documents duly signed,stamped or sealed, as instruments ofservice, are the intellectual propertyand documents of the architect,whether the object for which they aremade is executed or not. It shall beunlawful for any person to duplicateor make copies of said documents foruse in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said documents.WYETEESANITARY TEE90 DEG ELBOW45 DEG ELBOW45 DEG ELBOW90 DEG ELBOWUNION90 DEG ELBOWEND CAPSTACK (PIPE UP)STACK (PIPE DOWN)P - TRAPPURISER (PIPE UP)PDRISER (PIPE DOWN)MWATER METERGVGATE VALVELAVATORYCVCHECK VALVESHOWERHBHOSE BIBBLAVSHOSTORM DRAINAGE SHALL BE PROVIDED FOR ROOF AREAS, COURTS AND COURTYARDS TOCOLLECT STORM WATER AND DISCHARGE THE STORMWATER TO AN APPROVED POINT OFDISPOSAL NOT IN CONFLICT WITH OTHER ORDINANCES OR REGULATIONS.RISER (PIPE UP & DOWN)WATER CLOSETWCSTORM DRAINAGEFLOOR DRAINFDWATER CLOSETWC150 mm Ø uPVC WASTE PIPEH.1.LAVATORYLAVHANGERS AND SUPPORTSHOWER100 mm Ø uPVC WASTE PIPESHOPIPES SHALL BE SUPPORTED AT SUFFICIENTLY CLOSE INTERVALS TO KEEP THEM INALIGNMENT AND PREVENT SAGGING.75 mm Ø uPVC WASTE PIPEFLOOR DRAINFD50 mm Ø uPVC WASTE PIPEWATER SERVICE ENTRANCE75 mm Ø uPVC VENT PIPE63 mm Ø PPR CWL PIPE50 mm Ø uPVC VENT PIPE32 mm Ø PPR CWL PIPE75 mm Ø uPVC STORM DRAIN PIPE25 mm Ø PPR CWL PIPEWASTE PIPE STACK20 mm Ø PPR CWL PIPEMATERIAL SPECIFICATIONSCOLD WATERLINESHALL BE POLYPROPYLENE RANDOM CO-POLYMER TYPE 3SEWERLINE/VENT PIPES/DOWNSPOUTS/STORM DRAINAGESHALL BE UNPLASTICIZED POLYVINYL CHLORIDE (UPVC SERIES)LABORATORY/SHALL BE HIGH DENSITY POLYETHYLENE (HDPE PB16)SCALERA 9266 SECTION 33WATER SUPPLY LAYOUT SYMBOLSSTACK (PIPE UP & DOWN)WSVSDPCBPLUMBING NOTES1REPUBLIC OF THE PHILIPPINESDEPARTMENT OF HEALTHF.1.WATER SUPPLYSANITARY LAYOUT LEGENDSINDIRECT WASTEPROJECT TITLEPSHEET CONTENTSCHECKEDRECOMMENDING APPROVAL20 mm Ø PPR HWL PIPEDOWNSPOUTCATCH BASINPLUMBING LEGENDS2NTSVENT PIPE STACK1SCALECONCURREDNTSAPPROVEDPROPOSED RENOVATION OF BGHMCTHREE-STOREY BUILDING FORISOLATION ROOMSLOCATIONBGHMC Compound, Baguio CityCordillera Administrative RegionSHEET NO.P1AS SHOWNRICHIE RHEY R. DIRIGE, CEEngineer IV, Head EFMO - HOPSSBaguio General Hospital & Medical CenterVILMA O. MOLTIO, MPASupervising Administrative OfficerOIC,Chief Administrative Officer, HOPSS-BGHMCRAY P. SUANDING, MD, FPCP, FPCCPChief of Medical Professional StaffBaguio General Hospital & Medical CenterRICARDO B. RUNEZ JR. MD, FPCS, MHA, CESEMedical Center Chief IIBaguio General Hospital & Medical Center

REO VYLFPROJECT:PROPOSED RENOVATION OFTHREE-STOREY BUILDING FORISOLATION ROOMSNORTHHMAIN ENTRANCEMAIN EXITGATEIWATER TANKSTOREA6B2610GSTAIRS13JKOLD PSE FCWAYBGHMC DRIVE1427L12Q3RSPT2223 24UV1918WATER TANKWSHEDIL-AMTO BRGY. PH17OLD BUILDINGWATER TANKPARTIAL INDICATIVE BGHMC MASTERSITE DEVELOPMENT PLAN1PREPUBLIC OF THE PHILIPPINESDEPARTMENT OF HEALTHBAGUIO GENERAL HOSPITALAND MEDICAL CENTERBAGUIO CITYCORDILLERA ADMINISTRATIVE REGIONSANITARY ENGINEERLENON S. BANA-E, CE, SERA 9266 SECTION 33Drawings and specifications andother contract documents duly signed,stamped or sealed, as instruments ofservice, are the intellectual propertyand documents of the architect,whether the object for which they aremade is executed or not. It shall beunlawful for any person to duplicateor make copies of said documents foruse in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said documents.2SCALEPROJECT TITLE1:1,000 MTRSSHEET CONTENTSCHECKEDBENECO POST010010 00020RECOMMENDING APPROVAL30405060708050 000CONCURRED90BENECO POST100 000mmAPPROVEDPROPOSED RENOVATION OF BGHMCTHREE-STOREY BUILDING FORISOLATION ROOMSLOCATIONBGHMC Compound, Baguio CityCordillera Administrative Region25100mSHEET NO.P2AS SHOWNRICHIE RHEY R. DIRIGE, CEEngineer IV, Head EFMO - HOPSSBaguio General Hospital & Medical CenterVILMA O. MOLTIO, MPASupervising Administrative OfficerOIC,Chief Administrative Officer, HOPSS-BGHMCRAY P. SUANDING, MD, FPCP, FPCCPChief of Medical Professional StaffBaguio General Hospital & Medical CenterRICARDO B. RUNEZ JR. MD, FPCS, MHA, CESEMedical Center Chief IIBaguio General Hospital & Medical Center

3 7503 7501 850Ramp DnCONCURRED14RAY P. SUANDING, MD, FPCP, FPCCPChief of Medical Professional StaffBaguio General Hospital & Medical CenterL ROA2 2006753 6254 200D22 750APPROVEDRICARDO B. RUNEZ JR. MD, FPCS, MHA, CESEMedical Center Chief IIBaguio General Hospital & Medical CenterITAHOSP41 8004 8001 4126 075200mm STRUCTURAL GAP1 7256 075WC2 9383502 7001 5003 2753 27532 MM DIA CWL RISER (GF SUPPLY)WS3 05026 8001 775WC1 275HALLWAY3 050SHO200200LAVLAV2 950Ramp Up2 9501 8251 8253 3251 5001 5001 500SHO3 750RECOMMENDING APPROVAL3 750CHECKEDPERSONNEL ACCESS1 850SHOWSWCWCWSSHEET CONTENTS3 750ENTRANCEAS SHOWN13VILMA O. MOLTIO, MPASupervising Administrative OfficerOIC,Chief Administrative Officer, HOPSS-BGHMC3 750WSDnUpPROPOSED RENOVATION OF BGHMCTHREE-STOREY BUILDING FORISOLATION ROOMSLOCATION1011RICHIE RHEY R. DIRIGE, CEEngineer IV, Head EFMO - HOPSSBaguio General Hospital & Medical Center15 0006PROJECT TITLEWSBGHMC Compound, Baguio CityCordillera Administrative Region3 750RA 9266 SECTION 33HALLWAYLAVSHOWS1:100 MTSSCALE3PGROUND FLOOR WATERLINE LAYOUT1WSWSLAVWCEXIT4 0003 000250 1 3003 500SHOLAVWCWSWSDnUpEMERGENCYEXITWCWSDrawings and specifications andother contract documents duly signed,stamped or sealed, as instruments ofservice, are the intellectual propertyand documents of the architect,whether the object for which they aremade is executed or not. It shall beunlawful for any person to duplicateor make copies of said documents foruse in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said documents.3 750EEWWSAIRLOCKWSWS41 8001 5006 0752 4754 575SHOSANITARY ENGINEERWC2 100LENON S. BANA-E, CE, SEWS4BEDELEVATORACCESSGOING FROMDELTA E.R.8Ramp Up7EXISTING INFECTIOUSDESEASE BUILDING(PROPOSED DELTA E.R.)12WC3WCLAVNORTH250mm STRUCTURAL GAPBAGUIO GENERAL HOSPITALAND MEDICAL CENTERREPUBLIC OF THE PHILIPPINESDEPARTMENT OF HEALTH22 750BAGUIO CITYCORDILLERA ADMINISTRATIVE REGIONWSSHOWS5LAV2WSLAVWSWC1'EEWWSWSWSLAVSHO16751 7501 8757002 5001 0001 3002 7001 7252 5752 2004 3004 2004 0004 3002503 500JHG'GFEB C DA9SHEET NO.P3

3 7503 750RECOMMENDING APPROVAL133 750VILMA O. MOLTIO, MPASupervising Administrative OfficerOIC,Chief Administrative Officer, HOPSS-BGHMC3 7503 7503 750CHECKED15 0001 8501 8502 9502002002 9506 0756 0753502 700WSSHOROOF11RAY P. SUANDING, MD, FPCP, FPCCPChief of Medical Professional StaffBaguio General Hospital & Medical CenterCONCURRED142 200APPROVEDRICARDO B. RUNEZ JR. MD, FPCS, MHA, CESEMedical Center Chief IIBaguio General Hospital & Medical Center22 7501 5003 2753 2751 775SHO3 05026 8001 8251 8253 3251 5001 5001 500SHO1 275HALLWAY3 050WC32 MM DIA CWL RISER (2F SUPPLY)41 8004 800WS200mm STRUCTURAL GAPSHEET CONTENTSAS SHOWN3 750PROPOSED RENOVATION OF BGHMCTHREE-STOREY BUILDING FORISOLATION ROOMSLOCATION10RICHIE RHEY R. DIRIGE, CEEngineer IV, Head EFMO - HOPSSBaguio General Hospital & Medical Center3 7506PROJECT TITLEWSBGHMC Compound, Baguio CityCordillera Administrative Region1:100 MTSSCALEP 3aSECOND FLOOR WATERLINE LAYOUT1LAVLAV6753 6254 2004 0003 000250 1 3003 500WCWCWSWSWS41 800RA 9266 SECTION 33HALLWAYWSEEWDrawings and specifications andother contract documents duly signed,stamped or sealed, as instruments ofservice, are the intellectual propertyand documents of the architect,whether the object for which they aremade is executed or not. It shall beunlawful for any person to duplicateor make copies of said documents foruse in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said WSWS32 MM DIA CWLUpRISER (GF SUPPLY)DnBEDELEVATOR71 5006 0752 4754 575SHOSANITARY ENGINEERWC2 100LENON S. BANA-E, CE, SEWS4WCLAVNORTH250mm STRUCTURAL GAPBAGUIO GENERAL HOSPITALAND MEDICAL CENTERREPUBLIC OF THE PHILIPPINESDEPARTMENT OF HEALTH22 750BAGUIO CITYCORDILLERA ADMINISTRATIVE REGIONEXISTING INFECTIOUSDESEASE BUILDING(PROPOSED DELTA 751 7501 8757002 5001 0001 3002 7001 7252 5752 2004 3004 2004 0004 3002503 500JHG'GFEB C DAWC9SHEET NO.P3a

3 750RECOMMENDING APPROVAL133 7503 750VILMA O. MOLTIO, MPASupervising Administrative OfficerOIC,Chief Administrative Officer, HOPSS-BGHMC3 75015 0003 7503 750CHECKED3 7501 8501 8502 9502002002 950ROOF11CONCURRED14RAY P. SUANDING, MD, FPCP, FPCCPChief of Medical Professional StaffBaguio General Hospital & Medical CenterAPPROVEDRICARDO B. RUNEZ JR. MD, FPCS, MHA, CESEMedical Center Chief IIBaguio General Hospital & Medical Center22 7502 20067541 8004 8006 075WSSHO6 075200mm STRUCTURAL GAPSHEET CONTENTSAS SHOWN10RICHIE RHEY R. DIRIGE, CEEngineer IV, Head EFMO - HOPSSBaguio General Hospital & Medical Center3 7503502 7003 275WS1 775WC1 50032 MM DIA CWL RISER (2F SUPPLY)3 275SHO32 MM DIA CWL RISER (3F SUPPLY)3 05026 8001 8251 8253 3251 5001 5001 500SHO1 275HALLWAY3 050PROJECT TITLE6PROPOSED RENOVATION OF BGHMCTHREE-STOREY BUILDING FORISOLATION ROOMSLOCATIONLAVLAV1:100 MTSSCALEP 3bTHIRD FLOOR WATERLINE LAYOUT1WCWCWS3 6254 2004 0003 000250 1 3003 500LAVWCWSWSWS41 800RA 9266 SECTION 33WSBGHMC Compound, Baguio CityCordillera Administrative SDn32 MM DIA CWLUpRISER (GF SUPPLY)BEDELEVATOR71 5006 0752 4754 575SHOSANITARY ENGINEERWC2 100LENON S. BANA-E, CE, SEWS4WCWSDrawings and specifications andother contract documents duly signed,stamped or sealed, as instruments ofservice, are the intellectual propertyand documents of the architect,whether the object for which they aremade is executed or not. It shall beunlawful for any person to duplicateor make copies of said documents foruse in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said documents.EXISTING INFECTIOUSDESEASE BUILDING(PROPOSED DELTA E.R.)12WC3WCLAVNORTH250mm STRUCTURAL GAPBAGUIO GENERAL HOSPITALAND MEDICAL CENTERREPUBLIC OF THE PHILIPPINESDEPARTMENT OF HEALTH22 750BAGUIO CITYCORDILLERA ADMINISTRATIVE REGIONWSSHOWS5LAV2WSLAVWSWC1'EEWWSWSWSLAVSHO16751 7501 8757002 5001 0001 3002 7001 7252 5752 2004 3004 2004 0004 3002503 500JHG'GFEB C DAWC9SHEET NO.P3b

3 750RECOMMENDING APPROVAL3 75015 0003 7503 7503 7503 750CHECKED3 7501 8501 8502 9502 950200200CONCURRED14RAY P. SUANDING, MD, FPCP, FPCCPChief of Medical Professional StaffBaguio General Hospital & Medical CenterRICARDO B. RUNEZ JR. MD, FPCS, MHA, CESEMedical Center Chief IIBaguio General Hospital & Medical CenterAPPROVED1:100 MTSSCALEP 3cROOF WATERLINE LAYOUT141 8004 800GVGVGV6 0756 075200mm STRUCTURAL GAPSHEET CONTENTSAS SHOWN13VILMA O. MOLTIO, MPASupervising Administrative OfficerOIC,Chief Administrative Officer, HOPSS-BGHMC22 7502 2006753 6254 2004 0003 000250 1 3003 500PG1 2753502 70026 8003 27532 MM DIA CWL RISER (GF SUPPLY)3 27532 MM DIA CWL RISER (2F SUPPLY)GV CV3 0503 050PROJECT TITLEHBFVWATERTANK 1TAP TO EXISTING HOSPITAL WATER SUPPLYPRESSURETANKPROPOSED RENOVATION OF BGHMCTHREE-STOREY BUILDING FORISOLATION ROOMSLOCATION1011RICHIE RHEY R. DIRIGE, CEEngineer IV, Head EFMO - HOPSSBaguio General Hospital & Medical Center3 750GV CVBGHMC Compound, Baguio CityCordillera Administrative Region8PGV CVFVWATERTANK 241 80041 8251 8253 3251 5001 500RA 9266 SECTION 33GV CV6PS1 5001 5006 0752 4754 575SANITARY ENGINEER2 100LENON S. BANA-E, CE, SE3Drawings and specifications andother contract documents duly signed,stamped or sealed, as instruments ofservice, are the intellectual propertyand documents of the architect,whether the object for which they aremade is executed or not. It shall beunlawful for any person to duplicateor make copies of said documents foruse in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said documents.7EXISTING INFECTIOUSDESEASE BUILDING(PROPOSED DELTA E.R.)12ROOFING5NORTH250mm STRUCTURAL GAPBAGUIO GENERAL HOSPITALAND MEDICAL CENTER22 2004 300REPUBLIC OF THE PHILIPPINESDEPARTMENT OF HEALTH22 750BAGUIO CITYCORDILLERA ADMINISTRATIVE REGION1'6751 7501 8757002 5001 0001 3002 7001 7252 5754 2004 0004 3002503 500JHG'GFEB C DA132 MM DIA CWL RISER (3F SUPPLY)GV CV9SHEET NO.P3c

3 7503 7503 7503 7501 85075mmØ DP1 8502 950Ramp Up2 950CONCURREDDAPPROVEDRICARDO B. RUNEZ JR. MD, FPCS, MHA, CESEMedical Center Chief IIBaguio General Hospital & Medical Center22 75020020041 8004 8001 4126 075200mm STRUCTURAL GAP1 7256 075WC2 9381 2753502 7003 050HALLWAY3 0501 50026 8003 2753 275CO3 750RECOMMENDING APPROVAL3 750PERSONNEL ACCESS15 000CHECKED3 750WSCOSHEET CONTENTSRAY P. SUANDING, MD, FPCP, FPCCPChief of Medical Professional StaffBaguio General Hospital & Medical Center3 750WSPROJECT TITLEAS SHOWN13VILMA O. MOLTIO, MPASupervising Administrative OfficerOIC,Chief Administrative Officer, HOPSS-BGHMC1:100 MTSSCALE4PGROUND FLOOR SEWER LINE LAYOUT12 2006753 6254 2004 0003 000250 1 3003 500Ramp Dn75mmØ DP14COPROPOSED RENOVATION OF BGHMCTHREE-STOREY BUILDING FORISOLATION ROOMSLOCATION75mmØ DP1011RICHIE RHEY R. DIRIGE, CEEngineer IV, Head EFMO - HOPSSBaguio General Hospital & Medical CenterL ROAITAHOSPCOCO1 775FDFDWCFDFDWSWS1 8251 8253 3251 5001 500100 MM DIA WASTE STACKLAVCORA 9266 SECTION 3375mmØ DPBGHMC Compound, Baguio CityCordillera Administrative Region75mmØ DP9Ramp UpCOCO75mmØ DPCOFDWCFD75 MM DIA VENT STACKCOCOFDWSLAVLAVFD41 8001 5001 5006 0752 4754 575SANITARY ENGINEER2 100LENON S. BANA-E, CE, SE100 MM DIA WASTE STACKWCFDWS75mmØ DPENTRANCECOCOCOCOFDDrawings and specifications andother contract documents duly signed,stamped or sealed, as instruments ofservice, are the intellectual propertyand documents of the architect,whether the object for which they aremade is executed or not. It shall beunlawful for any person to duplicateor make copies of said documents foruse in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said documents.WSWSWSEXITCOFDDnUpLAV FD FDCO675mmØ DPEXISTING INFECTIOUSDESEASE BUILDING(PROPOSED DELTA E.R.)12FDFD FDWSCOCOEMERGENCYEXITBEDELEVATORACCESSGOING FROMDELTA E.R.8HALLWAYWSCOWSWSDnUp75 MM DIA VENT STACK7CO75mmØ DPWC100 MM DIA WASTE STACKLAVFDFD75mmØ DPCOCOWS4100 MM DIA WASTE STACK75 MM DIA VENT FD2WSLAVLAV75 MM DIA VENT STACK100 MM DIA WASTE STACKCOCOWSWC1'FDSEPTICTANKFDWCWSWSCO75mmØ DP75mmØ DP75mmØ DPWSWSCO75mmØ DP COTOSTP1NORTH250mm STRUCTURAL GAPBAGUIO GENERAL HOSPITALAND MEDICAL CENTERREPUBLIC OF THE PHILIPPINESDEPARTMENT OF HEALTH22 750BAGUIO CITYCORDILLERA ADMINISTRATIVE REGIONCOCO75 MM DIA VENT STACKCO100 MM DIA WASTE STACKCO75 MM DIA VENT STACK100 MM DIA WASTE STACKCO6751 7501 8757002 5001 0001 3002 7001 7252 5752 2004 3004 2004 0004 3002503 500JHG'GFEB C DACOLAV FDSHEET NO.P4

3 750RECOMMENDING APPROVAL3 7503 7503 7503 7503 750CHECKED13VILMA O. MOLTIO, MPASupervising Administrative OfficerOIC,Chief Administrative Officer, HOPSS-BGHMC75mmØ DPRAY P. SUANDING, MD, FPCP, FPCCPChief of Medical Professional StaffBaguio General Hospital & Medical CenterCONCURRED141 8501 8502 9502002002 950ROOF1141 8004 800FD6 075200mm STRUCTURAL GAP6 075350DnUpAPPROVEDRICARDO B. RUNEZ JR. MD, FPCS, MHA, CESEMedical Center Chief IIBaguio General Hospital & Medical Center22 7502 7003 0501 50026 8003 2753 2751 775CO1 275HALLWAY3 050WC2 2006753 6254 2001:100 MTSSCALEP 4aSECOND FLOOR SEWER LINE LAYOUT175mmØ DP15 000SHEET CONTENTS3 750PROJECT TITLE75mmØ DPAS SHOWN75mmØ DPRICHIE RHEY R. DIRIGE, CEEngineer IV, Head EFMO - HOPSSBaguio General Hospital & Medical Center3 7501 8251 8253 3251 5001 500RA 9266 SECTION 3341 8001 5001 5006 0752 4754 575FDSANITARY ENGINEERFDPROPOSED RENOVATION OF BGHMCTHREE-STOREY BUILDING FORISOLATION ROOMS75mmØ DP10COLOCATION75mmØ DP9BEDELEVATORROOFWSCOFDCOLAVLAVCOWC75 MM DIA VENT STACKFDLAVWSWS75mmØ DPWCWSWS4 0003 000250 1 3003 500COFDFDFD2 10075mmØ DPCOLENON S. BANA-E, CE, SEHALLWAYCOCOFDBGHMC Compound, Baguio CityCordillera Administrative RegionCO8FDLAVWSCOFDWC75 MM DIA VENT STACK FD7WS75mmØ DPWSCOWCLAVWSWCFDLAVFDCO100 MM DIA WASTE STACK75 MM DIA VENT STACKWSFDDrawings and specifications andother contract documents duly signed,stamped or sealed, as instruments ofservice, are the intellectual propertyand documents of the architect,whether the object for which they aremade is executed or not. It shall beunlawful for any person to duplicateor make copies of said documents foruse in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said documents.CO675mmØ DPWS4COCOCO100 MM DIA WASTE STACKWSCOCOFDCOCOFDCOWS5WSWSDnUp75mmØ DPWCCOCO WSNORTH250mm STRUCTURAL GAPBAGUIO GENERAL HOSPITALAND MEDICAL CENTERREPUBLIC OF THE PHILIPPINESDEPARTMENT OF HEALTH22 750BAGUIO CITYCORDILLERA ADMINISTRATIVE REGIONCOWCWS3WSLAVCOFDLAV100 MM DIA WASTE STACKFD2EXISTING INFECTIOUSDESEASE BUILDING(PROPOSED DELTA E.R.)12WC1'LAV75 MM DIA VENT STACK100 MM DIA WASTE STACKFDWCLAVWS100 MM DIA WASTE STACKFD1WSWS75mmØ DP75mmØ DP75mmØ DP75mmØ DP100 MM DIA WASTE STACK75 MM DIA VENT STACK100 MM DIA WASTE STACK75 MM DIA VENT STACK6751 7501 8757002 5001 0001 3002 7001 7252 5752 2004 3004 2004 0004 3002503 500JHG'GFEB C DACO WCSHEET NO.P4a

3 750RECOMMENDING APPROVAL3 7503 7503 7503 7503 750CHECKED15 0001 8501 8502 9502002002 950ROOF11CONCURRED14RAY P. SUANDING, MD, FPCP, FPCCPChief of Medical Professional StaffBaguio General Hospital & Medical CenterAPPROVEDRICARDO B. RUNEZ JR. MD, FPCS, MHA, CESEMedical Center Chief IIBaguio General Hospital & Medical Center22 75041 8004 800FD6 0756 075200mm STRUCTURAL GAPSHEET CONTENTS3 750350DnUp2 7003 0501 50026 8003 2753 2751 775CO1 275HALLWAY3 050PROJECT TITLEAS SHOWN13VILMA O. MOLTIO, MPASupervising Administrative OfficerOIC,Chief Administrative Officer, HOPSS-BGHMC3 7501 8251 8253 3251 5001 500RA 9266 SECTION 3341 8001 5001 5006 0752 4754 575FDSANITARY ENGINEERFDPROPOSED RENOVATION OF BGHMCTHREE-STOREY BUILDING FORISOLATION ROOMS10RICHIE RHEY R. DIRIGE, CEEngineer IV, Head EFMO - HOPSSBaguio General Hospital & Medical Center1:100 MTSSCALEP 4bTHIRD FLOOR SEWER LINE LAYOUT1WC2 2006753 6254 200COLOCATION75mmØ DP9BEDELEVATORROOFWSCOFDCOLAVLAVCOWC75 MM DIA VENT STACKFDLAVWSWS75mmØ DPWCWSWS4 0003 000250 1 3003 500COFDFDFD2 10075mmØ DPCOLENON S. BANA-E, CE, SEHALLWAYCOCOFDBGHMC Compound, Baguio CityCordillera Administrative RegionCO8FDLAVWSCOFDWC75 MM DIA VENT STACK FD7WS75mmØ DPWSCOWCLAVWSWCFDLAVFDCO100 MM DIA WASTE STACK75 MM DIA VENT STACKWSFDDrawings and specifications andother contract documents duly signed,stamped or sealed, as instruments ofservice, are the intellectual propertyand documents of the architect,whether the object for which they aremade is executed or not. It shall beunlawful for any person to duplicateor make copies of said documents foruse in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said documents.CO675mmØ DPWS4COCOCO100 MM DIA WASTE STACKWSCOCOFDCOCOFDCOWS5WSWSDnUp75mmØ DPWCCOCO WSNORTH250mm STRUCTURAL GAPBAGUIO GENERAL HOSPITALAND MEDICAL CENTERREPUBLIC OF THE PHILIPPINESDEPARTMENT OF HEALTH22 750BAGUIO CITYCORDILLERA ADMINISTRATIVE REGIONCOWCWS3WSLAVCOFDLAV100 MM DIA WASTE STACKFD2EXISTING INFECTIOUSDESEASE BUILDING(PROPOSED DELTA E.R.)12WC1'LAVCOFDWCLAVWS100 MM DIA WASTE STACKFD1WSWS75mmØ DP75mmØ DP75mmØ DP75mmØ DP100 MM DIA WASTE STACK75 MM DIA VENT STACK100 MM DIA WASTE STACK75 MM DIA VENT STACK6751 7501 8757002 5001 0001 3002 7001 7252 5752 2004 3004 2004 0004 3002503 500JHG'GFEB C DACO WCSHEET NO.P4b

3 750RECOMMENDING APPROVAL3 7503 7503 7503 750CHECKED13VILMA O. MOLTIO, MPASupervising Administrative OfficerOIC,Chief Administrative Officer, HOPSS-BGHMC3 7501 8501 8502 9502002002 950CONCURRED14RAY P. SUANDING, MD, FPCP, FPCCPChief of Medical Professional StaffBaguio General Hospital & Medical CenterAPPROVED1:100 MTSSCALEP 4cROOF SEWER LINE LAYOUT1RICARDO B. RUNEZ JR. MD, FPCS, MHA, CESEMedical Center Chief IIBaguio General Hospital & Medical Center22 7502 2006753 6254 20041 8004 8006 0756 075200mm STRUCTURAL GAPSHEET CONTENTS15 0001 27535062 70026 8003 2753 27575mmØ DP43 0503 050PROJECT TITLEAS SHOWN1011RICHIE RHEY R. DIRIGE, CEEngineer IV, Head EFMO - HOPSSBaguio General Hospital & Medical Center3 75075mmØ DPPROPOSED RENOVATION OF BGHMCTHREE-STOREY BUILDING FORISOLATION ROOMS75mmØ DP94 0003 000250 1 3003 50075 MM DIA VTR75 MM DIA VTR75mmØ DP75mmØ DP75 MM DIA VTRLOCATION81 8251 82575 MM DIA VENT STACK3 3251 5001 500RA 9266 SECTION 3375mmØ DPBGHMC Compound, Baguio CityCordillera Administrative Region7ROOFING75mmØ DP5EXISTING INFECTIOUSDESEASE BUILDING(PROPOSED DELTA E.R.)1275mmØ DP3Drawings and specifications andother contract documents duly signed,stamped or sealed, as instruments ofservice, are the intellectual propertyand documents of the architect,whether the object for which they aremade is executed or not. It shall beunlawful for any person to duplicateor make copies of said documents foruse in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said documents.3 750275mmØ DP41 8001 5001 5006 0752 4754 575SANITARY ENGINEER2 100LENON S. BANA-E, CE, SE75mmØ DPNORTH250mm STRUCTURAL GAPBAGUIO GENERAL HOSPITALAND MEDICAL CENTER1'2 2004 300REPUBLIC OF THE PHILIPPINESDEPARTMENT OF HEALTH22 750BAGUIO CITYCORDILLERA ADMINISTRATIVE REGION175 MM DIA VTR75 MM DIA VTR75mmØ DP75mmØ DP75mmØ DP75mmØ DP6751 7501 8757002 5001 0001 3002 7001 7252 5754 2004 0004 3002503 500JHG'GFEB C DASHEET NO.P4c

CAYWS45NGEEREMEXITSSLACCEESS OMCE FR R.AC ING TA E.OG 075041601122379OALRTAISP378D1850121480070022USTIO G R.)EC ILDINTA E.FIN BU ELING SE DIST SEAOSEDXE DE SORampSHUp3ENCRATENDn2D ORBE VATEEL501'OSHpRa371LAV WCHWSUmpWSWCWSLAVWSWALLWSDnWCUp37VLALAV WCWCWSWS WSLAVWSLAVWSAYOSHWSLWWCTAWSWC50LAWSVO WATENFRK 0mWCFVRTE 1WATANK50VSLA AVOWCVLA WCPSCVGV V CV VG V CGRESUES KPR TANPVCGVSHWSWC48006075WSLAV350WEE WSSWWS752500035ALRTUTmSWSWSOSH1222504575INGWS SO3 0 2 70050B2517300EATSH75CD100400027E7500 0Y)C 4 20 OPL Y) WC50WL VUPWSS2HF S SUPP LALY)3(PVERUP(2FL0A00SSIR1LSR RISE(GFWRVCCWELADIA L A CW WL RISMMDICW32 E 0000 OSH24760 575JOSHVLAWEE13005037133514WATERLINE ISOMETRY1PREPUBLIC OF THE PHILIPPINESDEPARTMENT OF HEALTHBAGUIO GENERAL HOSPITALAND MEDICAL CENTERBAGUIO CITYCORDILLERA ADMINISTRATIVE REGIONSANITARY ENGINEERLENON S. BANA-E, CE, SERA 9266 SECTION 33Drawings and specifications andother contract documents duly signed,stamped or sealed, as instruments ofservice, are the intellectual propertyand documents of the architect,whether the object for which they aremade is executed or not. It shall beunlawful for any person to duplicateor make copies of said documents foruse in the repetition of and for otherprojects or buildings, whetherexecuted partly or in whole, withoutthe written consent of the architect orauthor of said documents.5SCALEPROJECT TITLE1:120 MTRSSHEET CONTENTSCHECKEDRECOMMENDING APPROVALCONCURREDAPPROVEDPROPOSED RENOVATION OF BGHMCTHREE-STOREY BUILDING FORISOLATION ROOMSLOCATIONBGHMC Compound, Baguio CityCordillera Administrative RegionSHEET NO.P5AS SHOWNRICHIE RHEY R. DIRIGE, CEEngineer IV, Head EFMO - HOPSSBaguio General Hospital & Medical CenterVILMA O. MOLTIO, MPASupervising Administrative OfficerOIC,Chief Administrative Officer, HOPSS-BGHMCRAY P. SUANDING, MD, FPCP, FPCCPChief of Medical Professional StaffBaguio General Hospital & Medical CenterRICARDO B. RUNEZ JR. MD, FPCS, MHA, CESEMedical Center Chief IIBaguio General Hospital & Medical Center

5mD ORBE COWSVLAWC EmØ75m75mSS OMCE FR R.AC ING TA E.OG DELONNmØmØ75mCONVEIAMDM75FDCOWSWS50COWCLAVCODFDn USTIO G R.)EC ILDINTA E.FIN BU ELING SE DIST SEAOSEDXE DE DLWITEXWSVHAL4CODKWCTAFCCO OTSCENVDIASMM7W5WSLAVLAWWSVLACODC F18503WS 411WS48006075COCOCO800STWS350PTOCOCOCODDFWS FSOCWRVT75003575DMM12A250IAWS1BDH'GCOWS3 0 2 70050CmWCKWS 75ACFDCOSTAVWSTLNKFDAC VECOFDCE ST DIACO 0WC0SWT 5 MM Ø DP2DAF2SW V7 75FmDmWDIA LACOWASCKMCMO0ST50716FDASTEWCO50S00 1 7WIAP43MDLAVØDMm10075mFDFD CK WSCO5CO7ATWC18WSDPTSRCO KFDVSENIA VTmØAC0mVWL05A77IAM DFD E ST M DMFDFDCODPST M 5mØFDCCOOCOCWA WC75 775m DPWOAIDPCmØCMDWS75mAV F5mDmØWML7FWDSV100 CCOOOLAWSCFDFDCOWSWCWSVRATLVCOIAFD WSWSCOD DMDFOMCF WC75WSCOSFDFD WDPWCmØCO75mDVFAWC DLFVCOWSLAWSFDFDSWSWCCOCO WFDKSCWSA WVTWCOSLACKOTEWS CCSOLWAACIRODIAFDDPMMmØ0m5710COFDC COWCOCOLAVWSFDCOKACCO SSTWCWCOFDNTEVSCKDIA CWVTA WSPLA 5 MM O WESØDT7CSmm5A7WAYDPODIAmØ SOMDV FSTLA 75 M WC 50032WSCKTAWSSTE STACKPDPWA NTCSK mCØKDmØDIA A VSETA S75TmA75mMIETM D N ST100 5 MIAMVE WAOA7200 0C0M DM DIMC 4 2575 00 MW1FDWSDPmØ 500075m 2 71 0V2A00 LK13ACWS00LEASVT40SSTAW W CO ACK00T P27DIADPT KS ØKDMMmØENAC 5TmAmC0075m1 CO DNIATVSTTE S7E S25MMV WACO1775DIADIA00MMMMAP43C5G7 00WLOACDP 1RFDWS75TU25mØUC75mTRVSALmm250WSLAVCOSW CODPK KmØAC ACST ST75mTN ASTEEV WDIADIACOMM M75 00 MWC1OCFDICPTSE TANKFDVFDLAVAL100WAFD75mCKTAE S ACKTTSWA T SIA EN DPDPM D DIA V5mmØCO 75mmØM7100 5 MMCO7FDFDCKWCTASESTWAKIAACDST KMMTE TACS100SDASW NT FDPDWIA VE Ø DPCO 75mmØMOM M DIA 75mm010 C5 MCO7FDFDCKAC WTESSTCKWAATAIDE S CKMMST STAA0W NT D10DIAS VE FPMM MWDIA mmØ D0O075C1 C5 OMDPCO7mØ75mOCOFDCFDCSDWF 10JmØ75mCTAESSTM0MFDKDPmØ75mM100CKTAE S CKST STA DPAW NT mØDIA VE 75mMM M DIA001 5M7WCTAMCOLAVNTKAC VEFDST DIAEWCST MM DPFDWA 75 5mMDDPDPmØmØIAM75ASTNTVE Ø DP2100mØ75mRVTPØD24760 575M75IAMDMD13005037133514SEWER LINE ISOMETRY1P 5aREPUBLIC OF THE PHILIPPINESDEPARTMENT OF HEALTHBAGUIO GENERAL HOSPITALAND MEDICAL CENTERBAGUIO CITYCORDILLERA ADMINISTRATIVE REGIONSANITARY ENGINEERLENON S. BANA-E, CE, SERA 9266 SECTION 33Drawings and specifications andother contract documents duly signed,stamped or sealed, as instruments ofservice, are the intellectual propertyand documents of the architect,whether the object for which they aremade is executed or not. It shall beunlawful for any person to duplicateor make copies of said documents foruse in

plumbing general notes all plumbing works included herein shall be executed according to the provision of the national plumbing code of the philippines and the local rules and regulation a. vertical piping 1. plastic pipe - shall be supported at every - (1) meter interval b. horizontal piping 1. plastic pipe - shall be supported by stiff metal .